Research on Dynamic Optimization of a Critical Path Based on Stochastic Duration and the Earned Value Method
Critical paths are widely used in project schedule management, but most existing studies ignore the volatility and dynamic characteristics of project duration, which increases the risk of project implementation. This paper proposes a dynamic optimization model of random duration and the EVM (earned...
Saved in:
| Main Authors: | Ping Cao, Danyang Li, Zhi Cao, Dinglei Huang, Jiawei Wang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-04-01
|
| Series: | Buildings |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2075-5309/15/8/1285 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
MONITORING AND CONTROL SYSTEM OF THE STAKEHOLDERS ACTIVITIES FOR PROJECT BASED ON THE EARNED DURATION MANAGEMENT METHOD
by: R. Yu. Dashkov, et al.
Published: (2018-04-01) -
Improving predictions of the Estimate at Completion using the classic Earned Value input
by: Anna Starczyk-Kołbyk
Published: (2024-12-01) -
A novel 5.1–7.1 GHz front-end power amplifier for wireless applications with −35 dB Error Vector Magnitude
by: Pawankumar B., et al.
Published: (2024-12-01) -
Performance of 256QAM in LTE-Hi indoor scenario
by: Shan LIU, et al.
Published: (2016-01-01) -
Performance of 256QAM in LTE-Hi indoor scenario
by: Shan LIU, et al.
Published: (2016-01-01)