Critical Risk Factors of Stakeholder Collaboration Impacting BIM Implementation in High-Rise Residential Building Projects Under the DBB System: A Delphi Survey
Although the design-bid-build (DBB) system has poor stakeholder collaboration due to the separation between architects, engineers, and contractors in its linear process, resulting in longer schedules and cost overruns, DBB remains the most widely used project delivery system due to its benefits, suc...
Saved in:
Main Authors: | Dang Huy Ly, Hyosoo Moon, Hyunkyu Shin, Yonghan Ahn |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2024-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2024/9888982 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Between the common and the private space: Tensions in the maintenance of high-rise residential buildings
by: Natalia Ponce-Arancibia
Published: (2023-05-01) -
Performance optimization of high-rise residential buildings in cold regions considering energy consumption
by: Liwei Song
Published: (2025-01-01) -
Evolutionary Game Analysis of BIM Adoption among Stakeholders in PPP Projects
by: Chong Jia, et al.
Published: (2021-01-01) -
BIM and Collaborative Practices. Expertise and Skills from the Digital Environment
by: Maria Antonietta Esposito, et al.
Published: (2019-06-01) -
BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea
by: Joo-sung Lee, et al.
Published: (2019-01-01)