Determination of Permissible Short-Time Emergency Overloading of Turbo-Generators and Synchronous Compensators
The paper shows that failure to take into account variable ratio of short-time emergency overloading of turbo-generators (synchronous compensators) that can lead to underestimation of overloading capacity or impermissible insulation over-heating.A method has been developed for determination of permi...
Saved in:
Main Authors: | V. A. Anischenko, V. A. Adamtsevich |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2011-08-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/269 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Technical and Economic Advantages of Turbo-Drive Variant with TRB Turbines over Turbo-Generator Variant in Low Power Engineering
by: N. V. Panteley
Published: (2008-04-01) -
Method for Monitoring the Stator Core of a Powerful Turbo Generator
by: A. S. Levitskyi, et al.
Published: (2021-07-01) -
Features of the Calculated Determination of the Thermal State of the Turbo Generator Brush-Contact Device
by: Anton Ye. Kovryha
Published: (2024-12-01) -
The Permissible under Heating Conditions Torque of a Frequency-Controlled Synchronous Motor of Permanent Magnets
by: B. I. Firago, et al.
Published: (2018-12-01) -
LEGITIMATE PERMISSIONS AND SPECIFITY OF THEIR ENFORCEABILITY IN MODERN RUSSIA
by: V. Subochev, et al.
Published: (2014-06-01)