A Study of Millisecond Blasting on High Bench at Barun Iron Ore Operation

To improve the productivity and efficient of modern large-scale open-cut mines, a number of technologies are developed and trialed, including new blasting equipment, larger blasting holes, high benches, air spacing, and short-delay blasting within holes. However, the relative blasting parameters nee...

Full description

Saved in:
Bibliographic Details
Main Authors: Pengfei Zhang, Runcai Bai, Xue Sun, Haoran Li, Honglu Fei, Shijie Bao
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Geofluids
Online Access:http://dx.doi.org/10.1155/2021/3645438
Tags: Add Tag
No Tags, Be the first to tag this record!